Shangqiu Yilong Steel Structure Engineering Material Co.,Limited
Products
Contact Us
  • Contact Person : Ms. Linsa Lee
  • Company Name : Shangqiu Yilong Steel Structure Engineering Material Co.,Limited
  • Tel : 86-370-2930008
  • Fax : 86-370-2930008
  • Address : henan,Shangqiu,West development zone
  • Country/Region : China
  • Zip : 476000

plastic recycling equipment

plastic recycling equipment
Product Detailed
Related Categories:Cement Making Machinery

The brief introduction of tyre pyrolysis machine

Five models as below:

2200*6000  per batch 5tons whole tyres, 3batch 2days.

2200*6600  per batch 5tons whole tyres, 3batch 2days.

2600*6000  per batch 8tons whole tyres, 1batch 1day.

2800*6000  per batch 10tons whole tyres. 1batch 1day.

2800*6600  per batch 12tons whole tyres. 1batch 1day.

If the tyres is chipped, can feed more.

The whole batch time:

Model

Feeding time

Processing time

Cooling time

Discharge slag

totally

2200*6000

2hours

7-8hours

2hours

2hours

14hours

2200*6600

2hours

8hours

2hours

2hours

14hours

2600*6000

3 hours

10 hours

3 hours

3 hours

19 hours

2800*6000

3 hours

12 hours

3 hours

3 hours

21 hours

2800*6600

3 hours

13-14 hours

3 hours

3 hours

23 hours

Fuel

The fule can be :fule oil,  heavy oil, coal, firewood.

Using the fule at the beginning and at the end , using waste gas (8-10% gas can not become oil at normal pressure and normal temperature )heat the machine at the middle.so generally,per ton tyre need 60kg coal.

End product percentage .

For example, raw material is tyre.

No

Name

percentage

1

Tyre oil

45%

2

Carbon black

35%

3

Steel wire

10-12%

4

Waste gas

8-10%

Machine motor and work Power 

No

Model

Fun

Speed reducer

Water pump

Oil pump

1

2200*6000

4KW

3KW

1.5KW

1.5KW

2

2200*6600

4KW

3KW

1.5KW

1.5KW

3

2600*6000

7.5KW

5.5KW

1.5KW

1.5KW

4

2800*6000

7.5KW

5.5KW

1.5KW

1.5KW

5

2800*6600

7.5KW

5.5KW

1.5KW

1.5KW

Payment:

Frist pay 30% as advance by TT, when delivery pay 70% by TT 

Delivery time:

We will delivery the machine within 15-25days after get the advance payment(30% of the total amount).

Warranty and machine life:

We guarantee the complete machine one year, the reactor life more than 4 years,others parts no need change lifelong expect the wearing parts.

The machine Raw material:

The reactor is made of Q245R(Q345R) Boiler plate.

The machine installation and catalyst formula:

We will give the foundation drawings to buyer after make the order .we will send engineer when buyer get the machine. The engineer mainly install the machine and training your workers.it is free, you just pay the ticket, accommodation and food is ok.

we will supply the catalyst formula after you order the machine,you can buy it at your local.

The shipment and the containers:

Model

40HQ containers

40FR open containers

note

2200*6000

2

/

2200*6600

2

/

2600*6000

1

1

2800*6000

1

1

2800*6600

1

1

The machine weight:

Model

Totally weight

note

2200*6000

27tons

2200*6600

29tons

2600*6000

32tons

2800*6000

35tons

2800*6600

37tons

FOB Port (China):

FOB lianyungang port,located on Jiangsu Province,China.

Note:

a)The tyre oil can be sell directly or use the distillation machine refining again. After refining, the end product is gasoline and diesel, we also can supply the distillation machine.

b)The carbon black can be sell directly or use the carbon black refining again. After refining ,the carbon black can be 300-1000mesh or 1000-2500mesh, We slao can supply the carbon black refining machine.



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.